Furaat Service and Maintenance ensure optimal performance, efficiency, and longevity of rainwater harvesting systems
Extended system life and reliability
Consistent filtration and recharge efficiency
Reduced maintenance issues and downtime
Sustainable and hassle-free system operationProjects Executed
Crores Litres Conserved
Esteem Clients
Scheduled servicing for continuous system performance
Complete system checks including storm water drains, filters, recharge wells and tanks
Cleaning of primary and secondary modules to prevent clogging
Inspection of pipes, joints, and fittings to avoid leaks or damage
Monitoring filtration efficiency and water percolation
Detailed reports on system condition and maintenance activities
Response for unexpected breakdowns or issues
Guidance on best practices for usage and upkeep
Precast Modular Step Well SFM 2350/3475
01. Open lid carefully after clearing visible deposits on the top
02. Remove gravels from the top chamber on a tarpaulin
03. Clean gravel thoroughly with pressurized water
04. Lift intermediate lid with care to access sand bed
05. Remove top 5 cm layer of sand, wash it, and put it back, do not disturb the rest
06. In case of heavy sedimentation remove entire sand from the top module on a tarpaulin and wash it thoroughly with clean water
07. Clean stainless steel screen using a brush, ensure slots are clean and clear
08. Wash screen and the inner walls with clean water, allow it to dry
09. Before putting washed sand back in the bottom module ensure corners are free from deposits or unwanted growth. It is important that level of sand always stays at least 5 cm above the top level of stainless screen.
10. Place spacers for intermediate lid
11. Place inter-mediate lid back on the spacers
12. Fill washed gravels back in top module
13. Close top Lid carefully
14. Always keep harvesting unit and its surrounding clean
Precast Modular Step Well HFM 2350/3475
01. Open lid carefully after clearing visible deposits on the top
02. Rinse gravels thoroughly with water and wait for a while
03. Use pressurized water from inside out to back flush all entry points
04. In case of heavy sedimentation remove entire gravel from the top module on a tarpaulin and wash it thoroughly with clean water
05. Remove the spine assembly before opening intermediate lid
06. Lift intermediate lid with care to access sediment module
07. Scrape all visible sediments from bottom module
08. Wash inner walls with clean water, allow it to dry
09. Close the intermediate lid carefully Put spine assembly back in place
10. Before putting washed gravel back in the bottom module. ensure comers are free from deposits or unwanted growth. Level of graveis must stay at least 5 cm above the top level of 64 inlets
11. Clean all 64 inlets with brush and water, ensure all are clear and clog free
12. Close top lid carefully
13. Brush clean top and outer surfaces
14. Visual Inspection at regular intervals and Protective Coating will add life to Harvesting System
Important : Furaat Rainwater Harvesting Systems Are Meant Only For Rainwater, Any Discharge Fed To These System Will Not Only Reduce Its Performance, But Also Damage Underground Aquifers Permanently, It Is A Punishable Offence
Get in touch with us for customized rainwater harvesting solutions